Search This Blog

Wednesday, May 2, 2012

Software Testing Quiz - 4

1. Retesting modules connected to the program or component after a change has been made?
[A]Full Regression Testing
[B]Unit Regression
[C]Regional Regression
[D]Retesting


2. An Important metric is the number of defects found in internal testing compared to the defects found in customer tests, Status of test activities against the plan, Test coverage achieved so far, comes under
[A]Process Metric
[B]Product Metric
[C]Test Metric
[D]None of the above


3. Alpha testing will be done at,
[A]User's site
[B]Developers' site
[C]Both places
[D]None of the above


4. SPICE Means
[A]Software Process Improvement and Capability Determination
[B]Software Process Improvement and Compatibility Determination.
[C]Software Process Invention and Compatibility Determination.
[D]Software Process Improvement and Control Determination


5. Requirements Specification, Planning, Test case Design, Execution, Bug Reporting & Maintenance. This Life Cycle comes Under
[A]SDLC
[B]STLC
[C]SQLC
[D]BLC


6. It provides a set of levels and an assessment model, and presents a set of recommended practices that allow organizations to improve their testing processes.
[A]TIM (Testing Improving Model)
[B]TMM (Testing Maturity Model)
[C]TQM(Total Quality Management)
[D]None of the above


7. Standards and procedures for managing changes in an evolving software product is called?
[A]Confirmation Management
[B]Confederation Mangement
[C]Configuration Management
[D]Compartability Management


8. This Testing Technique examines the basic program structure and it derives the test data from the program logic; Ensuring that all statements and conditions executed at least once. It is called as
[A]Block box Testing
[B]White box Testing
[C]Grey Box Testing
[D]Closed Box Testing


9. This type of test include, how well the user will be able to understand and interact with the system?
[A]Usability Testing
[B]User Acceptance Testing
[C]Alpha Testing
[D]Beta Testing


10. Defects generally fall into the following categories?
[A]WRONG
[B]MISSING
[C]EXTRA
[D]All the above


11. What is correct Software Process Cycle?
[A]Plan(P)------>Check(C)------>Act(A)----->Do(D)
[B]Plan(P)------>Do(D)------>Check(C)----->Act(A)
[C]Plan(P)------>Do(D)------>Act(A)----->Check(C)
[D]None of the above


12. Conducted to validate that the application, database, and network they may be running on can handle projected volumes of users and data effectively. The test is conducted jointly by developers, testers, DBA’s and network associates after the system Testing called as
[A]Functional Testing
[B]Stress/Load Testing
[C]Recovery Testing
[D]Integration Testing


13. Beta testing will be done by
[A]Developer
[B]User
[C]Tester
[D]None of the above


14. Integration, It will come under
[A]CMM Level 1
[B]CMM Level 3
[C]CMM Level 2
[D]None


15. Which Software Development Life cycle model will require to start Testing Activities when starting development activities itself
[A]Water falls model
[B]Spiral Model
[C]V-model
[D]Linear model


0 comments: